COMPLETED PROJECTS YEAR 2004    

 


YEAR
CLIENT
  PROJECT
   
2004
BREDERO SHAW
 
Installation of anode  for TTM project.
2004
PPSC
 
Anode installation for Shakalin project.
2004
BREDERO SHAW
 
To perform dye penetrant inspection for 24”  dia pipes (internal) for jintan project.

2004

BREDERO SHAW

 

Installation of anode for Jintan project.

2004

BREDERO SHAW

 

Removal of concrete and asphalt enamel  coating .

2004

BREDERO SHAW

 

Installation of anode (normal & retrofit) for TTM project

2004

PPSC

 

Pipe repair for carbon steel pipes ( cold cutting and re-beveling & grinding )

2004

PPSC

 

Installation of anode for epmi project

2004

PPSC INDUSTRIS S/B

 

Perform pipe hot cutting  mand inspecrtction for  epmi du 3289 project

2004

PPSC

 

Pipe blasting and application of heat shrink sleeve for farley baram project

2004

PPSC INDUSTRIES S/B

 

Pipe blasting and application of heat shrink sleeve for farley epmi project

2004

PPSC INDUSTRIES S/B

 

Cutting & rebevel end damages linepipes use hot cut for epmi project

2004

PPSC INDUSTRIES S/B

 

Removal of concrete to kit type b anode for shakalin off shore project

2004

PPSC INDUSTRIES S/B

 

Doubler plate installation for 4.5 pipes ( pe coating ) for shakalin project

2004

PPSC INDUSTRIES S/B

 

Anode installation for farley baram project

2004

PPSC INDUSTRIES S/B

 

Fabication and installaion of sacrificial cathodic protetion systn onto the aspart enamel coated linepie c/w double plate installation

2004

SAIPEM/PPSC INDUSTRIES S/B

 

Pipe bundling strapping, rigging and handling for shakalin project

2004

PPSC INDUSTRIES S/B

 

To fabricate and install d. Plate for 4.5 pipes coated with pe for shakalin 2 phase 2 project

2004

EPMI/PPSC INDUSTRIES S/B

 

To blast to sa 2.5 & apply heat shrink sleeve onto bends, to blast & 3 coat system for emepmi project

2004

PPSC INDUSTRIES S/B

 

Design, procurement, fabricaion and instalation of hydraulic clamping equipment for the installation of anodes, infilling of anode gaps on pipes already cwc, re-fitting of anodes due to misalignment of anode inserts for shakalin project.

2004

SAIPEM/PPSC INDUSTRIES S/B

 

Anode installation (retrofit) for shakalin ii phase 2 project

2004

SAIPEM/PPSC INDUSTRIES S/B

 

Fabrication, installation, testing and commissioning of system 2 hydraulic jack system for aoe installation for shakalin ii phase 2 project

2004

SERAWAK SHELL/BREDERO SHAW

 

Installation of sacrificial cathodic protection system for shallow clastic project

2004

BREDERO SHAW

 

Installation of anode for john brookes project

2004

PPSC INDUSTRIES S/B

 

Stripping of 3lpp coating for 3jts offshore linepipe 519.40mm od x 19.7wt for bongkot project

2004

BREDERO SHAW (M) S/B / PETRONAS CARIGALI
SDN. BHD.

 

Anode installation for ruby project pipe size 10”, 3lpp coating, 32 anode sets.

2004

EMEPMI/PPSC INDUSTRIES S/B

 

Supply & install 50mm dia 5mm thick doubler plates, install cathodic proection system thick 35mm for emepmi seligi a to tapis a project.

2004

PPSC INDUSTRIES S/B

 

Installation anode id 565mm, pipe coating 3lpp, anode  id 554mm, pipe coating 3lpp, welding of steel strap (z plate) & mob-demob for bongkot project.

2004

PPSC INDUSTRIES S/B

 

Fabriation and installation of pipeline attachments and anode installation anode id 605mm, pipe coating 3lpp for bongkot project.

2004

PPSC INDUSTRIES S/B

 

Anode installation anode id 554mm & 365mm, pipe coating 3lpp for bongkot project.

2004

PPSC INDUSTRIES S/B

 

Anode installation anode id 365mm & 605mm, pipe coating 3lpp for bongkot project.

2004

PPSC INDUSTRIES S/B

 

Blasting and coating of 42 inch linepipe for scp project.

2004

PPSC INDUSTRIES S/B

 

Removal of concrete coating on pipe od 22”, 3lpp coating, and pipe cold cutting for bongkot project.

2004

BREDERO SHAW (M) S/B

 

Mechanical testing(destructive testing) and dye penetrate test and other applicable nondestructive testing for high strength steel pipe for shenzen project.

2004

BREDERO SHAW (M) S/B

 

Installation of pipe caging around 3lpp pipe prior to concrete coting  for shenzen project.

2004

BREDERO SHAW (M) S/B

 

Anode installation for pipe id 18”, 400mm l, 50mm thick for shenzen project.

2004

BREDERO SHAW (M) S/B

 

Trial feet anode id 18”,mob & demob for apache john brookes project

2004

BREDERO SHAW (M) S/B

 

Installation of caging/reinforce steel around the  coated pipe for ruby and shallow clastic project.

2004-2005

BREDERO SHAW (M) S/B

 

Caging insertion for anode installation for pipe id 16”, 90mm & 45mm thick for champion west project.

2004-2005

BREDERO SHAW (M) S/B

 

Anode installation for pipe id 16”, 90mm & 45mm thick for champion west project.

2004-2005

BREDERO SHAW (M) S/B

 

Anode installation for towngas-shenzen to tai po twin smaine gas pipeline project. Pipe size 18” 840 jts

2004-2005

BREDERO SHAW (M) S/B

 

Fabrication and installation of attachment and other accessaries including the installation of cathodic protection system  for pipe od 20”, 50mm & 45mm thick for lamma project.

2004-2005

BREDERO SHAW (M) S/B

 

Intallation of caging/reinforce steel  for the  anode installation of pipe od 20”, coating 50mm & 45mm thick for lamma project.

2004-2005

BREDERO SHAW (M) S/B

 

Additonal work for anode installation (thermit weld for champion west project)


 